32 Programming
Signal out-programming
The time values programmed in the menu "Signal times for signal circuit" are valid
for the entire year. In the menu "Signal out-programming" time periods can be
defined in which the signal shall be switched off automatically, e.g. holidays, bank
holiday, etc.
The dates to switch on and off the signal must be programmed. If the signal shall
only be switched off for one single day, it is enough to program the date the signal is
switched off. If no date to switch on the signal is programmed, the signal will be
switched on the following day. Up to 16 dates can be programmed.
The dates can be entered in any order, it is not necessary to order the dates
chronologically. But the date to switch off the signal must be followed by the date to
switch on. All dates will be ordered chronologically by the unit.
Programming proceeding see section "Column change timing".
The change criterion is indicated in field D1. 00 = signal "OUT", 01 = signal "ON".
Field D2 = day, field D3 = month.
Change or delete signal out-programming
The date values programmed can be changed or deleted at any time.
1.
Call up Programming routine
→
key "
R
".
2.
Select menu "Signal out-programming"
→
key "
S
".
→
The first date (chronologically ordered) is displayed.
3.
Select date with value to be changed
→
advance with key "
E
".
4.
Change criterion on/off and/or date
→
key "
R
" and "
E
".
To change further values repeat steps 3 and 4.
5.
Quit entry and menu
→
key "
S
".
Programming routine is left.
If you want to delete single values, proceed as described above. To delete the value
displayed, select "--" in the field D1 with the key "
R
". Confirm "--" the deletion
command with "
E
". The next time value programmed is displayed. Now the menu
can be left as described above or new values can be entered.
After leaving the menu item "signal out-programming" with "
S
" the programming
routine is left automatically. The unit executes an adjustment where the new
programmed values are set.