![INVENTOR u-match on/off Service Manual Download Page 69](http://html1.mh-extra.com/html/inventor/u-match-on-off/u-match-on-off_service-manual_2084115069.webp)
U-MATCH AIR CONDITIONERS INSTALLATION
66
Sponge (gray)
Drain hose
Clamp
Clamp(attachment)
Sponge(attachment)
Below 4mm
Figure 1-3-7
2
˅
Testing of Drainage System
After the electrical installation is completed, carry out the testing of the drainage system.
During the test, check if the water correctly flows through the pipelines. Carefully observe
the joints to ensure that there is no leakage. If the unit is to be installed in a new house, carry
out testing before decorating the ceiling.
3
˅
Matters of Attention
The diameter of the drain hose should be equal or bigger than the connection pipe’s. ( The
diameter of polythene pipe: Outer diameter 25mm Surface thickness 1.5mm)
Drain hose should be short and drooping gradient should at less 1/100 to prevent the
formation of air bubble.
If drain hose cannot has enough drooping gradient, drain raising pipe should be added.
To prevent bent of the drain hose, the distance between hoisting stand should is 1 to 1.5m.
(As shown in Figure 1-3-8)
P
ƻ
(Correct) 1/100 or more gradient
h
(wrong)
Figure 1-3-8
The install height of the drain raising pipe should less than 280mm.
The drain raising pipe should form a right angle with the unit, and distance to unit should not
beyond 300mm. (As shown in Figure 1-3-9)
Summary of Contents for u-match on/off
Page 1: ......
Page 4: ...INVENTOR COMMERCIAL AIR CONDITION U MATCH AIR CONDITIONERS 1 PRODUCT...
Page 24: ...U MATCH AIR CONDITIONERS PRODUCT 21 5 PIPING DIAGRAM...
Page 25: ...INVENTOR COMMERCIAL AIR CONDITION U MATCH AIR CONDITIONERS 22 CONTROL...
Page 26: ...U MATCH AIR CONDITIONERS CONTROL 23 CONTROL 1 OPERATION FLOWCHART 1 1 Cooling Dry Operation...
Page 27: ...U MATCH AIR CONDITIONERS CONTROL 24 1 2 Heating Operation...
Page 45: ...U MATCH AIR CONDITIONERS CONTROL 42 5 2 4 Dimensions...
Page 48: ...INVENTOR COMMERCIAL AIR CONDITION U MATCH AIR CONDITIONERS 45 INSTALLATION...
Page 91: ...INVENTOR COMMERCIAL AIR CONDITION U MATCH AIR CONDITIONERS 88 MAINTENANCE...
Page 101: ...U MATCH AIR CONDITIONERS MAINTENANCE 98 Malfunction display E6 Communications Failure...
Page 115: ...U MATCH AIR CONDITIONERS MAINTENANCE 112...
Page 163: ......