![INVENTOR u-match on/off Service Manual Download Page 121](http://html1.mh-extra.com/html/inventor/u-match-on-off/u-match-on-off_service-manual_2084115121.webp)
U-MATCH AIR CONDITIONERS MAINTENANCE
118
8. Vacuum pumping with
fluorin injection mouth
Pump vacuum through
fluorin injection mouth.
9. Refill of cooling medium
through fluorin injection
mouth
Refill cooling medium into
system through fluorin
injection mouth
Volume of refilling should
be in accordance with the
requirement on the unit
nameplate.
Disassembly and Assembly of 4-way valve
Remark: Make sure there isn’t any refrigerant in pipe system and the power supply is cut off before
removal of the 4-way valve.
Step Illustration
Handling
Instruction
1. Disassembly of solenoid
valve
Cut off power supply and
reclaim cooling medium
properly.
Disassemble solenoid
valve with wrench.
2. Removal of
electromagnetic valve
Take and remove solenoid
valve from 4-way valve.
Vacuum
pumping
through
process pipe
Vacuum
pumping
through
process pipe
Disassemble
solenoid
valve
Summary of Contents for u-match on/off
Page 1: ......
Page 4: ...INVENTOR COMMERCIAL AIR CONDITION U MATCH AIR CONDITIONERS 1 PRODUCT...
Page 24: ...U MATCH AIR CONDITIONERS PRODUCT 21 5 PIPING DIAGRAM...
Page 25: ...INVENTOR COMMERCIAL AIR CONDITION U MATCH AIR CONDITIONERS 22 CONTROL...
Page 26: ...U MATCH AIR CONDITIONERS CONTROL 23 CONTROL 1 OPERATION FLOWCHART 1 1 Cooling Dry Operation...
Page 27: ...U MATCH AIR CONDITIONERS CONTROL 24 1 2 Heating Operation...
Page 45: ...U MATCH AIR CONDITIONERS CONTROL 42 5 2 4 Dimensions...
Page 48: ...INVENTOR COMMERCIAL AIR CONDITION U MATCH AIR CONDITIONERS 45 INSTALLATION...
Page 91: ...INVENTOR COMMERCIAL AIR CONDITION U MATCH AIR CONDITIONERS 88 MAINTENANCE...
Page 101: ...U MATCH AIR CONDITIONERS MAINTENANCE 98 Malfunction display E6 Communications Failure...
Page 115: ...U MATCH AIR CONDITIONERS MAINTENANCE 112...
Page 163: ......