U-MATCH AIR CONDITIONERS MAINTENANCE
144
Disassembly of evaporator
Remark: Make sure the power supply is cut off and protect the copper tube and aluminum fin. If the time for disassembly shall
be long, put the copper tube under pressurized condition.
Step Illustration
Handling
Instruction
1. Disassembly of
right panel
Disassemle the fastening
screws on the right panel
and remove right panel(as is
shown in the graph, arrow
represents right panel).
2. Disassembly of
left panel
Disassemle the fastening
screws on the left panel and
remove left panel(as is
shown in the graph, arrow
represents left panel).
3. Disassembly of
evaporator
Disassemle the fastening
screws on the evaporator.
(As is shown in the graph,
in the circle there are two
fastening screws and in the
direction of arrow, two
more.)
Remove the evaporator.
4. Disassembly of
evaporator support
Disassemble the
self-tapping screw on the
evaporator support and
remove the evaporator
support.(As is shown in
the graph, in the circle
there are two fastening
screws and in the similar
position in the direction of
arrow, two more.)
Summary of Contents for u-match on/off
Page 1: ......
Page 4: ...INVENTOR COMMERCIAL AIR CONDITION U MATCH AIR CONDITIONERS 1 PRODUCT...
Page 24: ...U MATCH AIR CONDITIONERS PRODUCT 21 5 PIPING DIAGRAM...
Page 25: ...INVENTOR COMMERCIAL AIR CONDITION U MATCH AIR CONDITIONERS 22 CONTROL...
Page 26: ...U MATCH AIR CONDITIONERS CONTROL 23 CONTROL 1 OPERATION FLOWCHART 1 1 Cooling Dry Operation...
Page 27: ...U MATCH AIR CONDITIONERS CONTROL 24 1 2 Heating Operation...
Page 45: ...U MATCH AIR CONDITIONERS CONTROL 42 5 2 4 Dimensions...
Page 48: ...INVENTOR COMMERCIAL AIR CONDITION U MATCH AIR CONDITIONERS 45 INSTALLATION...
Page 91: ...INVENTOR COMMERCIAL AIR CONDITION U MATCH AIR CONDITIONERS 88 MAINTENANCE...
Page 101: ...U MATCH AIR CONDITIONERS MAINTENANCE 98 Malfunction display E6 Communications Failure...
Page 115: ...U MATCH AIR CONDITIONERS MAINTENANCE 112...
Page 163: ......