![INVENTOR u-match on/off Service Manual Download Page 42](http://html1.mh-extra.com/html/inventor/u-match-on-off/u-match-on-off_service-manual_2084115042.webp)
U-MATCH AIR CONDITIONERS CONTROL
39
5.1.4 Dimensions
5.2 Centralized Controller-week timer
5.2.1 Function
Centralized Control and Week Timer Functions: The centralized controller and the weekly timer
are integrated in the same wire controller. The system has both the centralized control and the
week timing functions. Up to 16 sets of units can be controlled simultaneously by the centralized
controller (weekly timer). The weekly timer has the function of invalidating the lower unit. The
weekly timing function is able to realized four timing ON/OFF periods for any unit every day, so
as to achieve fully automatic operation. No timing control can be set for holidays. On and off of
every duct type unit can be done through the Timer On / Off of this WEEKLY TIMER
ˈ
it can not
set other functions except on-off function of units.
Summary of Contents for u-match on/off
Page 1: ......
Page 4: ...INVENTOR COMMERCIAL AIR CONDITION U MATCH AIR CONDITIONERS 1 PRODUCT...
Page 24: ...U MATCH AIR CONDITIONERS PRODUCT 21 5 PIPING DIAGRAM...
Page 25: ...INVENTOR COMMERCIAL AIR CONDITION U MATCH AIR CONDITIONERS 22 CONTROL...
Page 26: ...U MATCH AIR CONDITIONERS CONTROL 23 CONTROL 1 OPERATION FLOWCHART 1 1 Cooling Dry Operation...
Page 27: ...U MATCH AIR CONDITIONERS CONTROL 24 1 2 Heating Operation...
Page 45: ...U MATCH AIR CONDITIONERS CONTROL 42 5 2 4 Dimensions...
Page 48: ...INVENTOR COMMERCIAL AIR CONDITION U MATCH AIR CONDITIONERS 45 INSTALLATION...
Page 91: ...INVENTOR COMMERCIAL AIR CONDITION U MATCH AIR CONDITIONERS 88 MAINTENANCE...
Page 101: ...U MATCH AIR CONDITIONERS MAINTENANCE 98 Malfunction display E6 Communications Failure...
Page 115: ...U MATCH AIR CONDITIONERS MAINTENANCE 112...
Page 163: ......