4. Secure the end of the PDU that has the short mounting brackets to the rack
cabinet first. Make sure that the short mounting brackets are aligned with the
outside of the rack flanges. Attach the brackets to the rack flanges with two M6
screws and two cage nuts or clip nuts per bracket. Use the cage nuts or clip
nuts and the screws that come with the rack-mounting kit.
LA
N
3
4
1
2
5
6
5. Secure the long mounting brackets and the 1 U blank filler panel to the rack
cabinet.
Blank filler panel
a. Adjust the long mounting brackets to fit the depth of the rack cabinet.
b. Make sure that the long mounting brackets are aligned with the inside of
the rack flanges.
22
DPI C13 PDU+, DPI C13 3-phase PDU+, DPI C19 PDU+, and DPI C19 3-phase PDU+: Installation and Maintenance Guide