Before Making Copies
2
im7520/im6020
2-23
Before Making C
opies
Chapter 2
3
Turn on the sub power
switch.
!
Detail
When the control panel is turned on by using the sub power switch, the
indicator on the [Start] key lights up in orange, and a screen indicating
that the machine is starting up appears.
After a few seconds, the message “Now warming up. Ready to scan.” ap-
pears on the touch panel, and the indicator on the [Start] key lights up in
green, indicating that a job can now be queued.
!
Detail
The default settings are those that are selected immediately after the ma-
chine is turned on (the power switch is set to “I”) and before any setting
is specified from the control panel or touch panel, and those that are se-
lected when the [Reset] key is pressed to cancel all settings specified
from the control panel or touch panel. The default settings can be
changed. For more details, refer to “Initial Setting” on page 12-20.
The factory default settings are the settings that were selected when this
machine was sent from the factory.
2
Note
A job can also be queued while the machine is warming up after the sub
power switch is turned on. For details, refer to “To scan during warm-up”
on page 2-24.
Summary of Contents for im6020
Page 1: ...www imagistics com User s Guide im7520 im6020 Copy Operations...
Page 22: ...10 Care of the Machine Chapter 10 Care of the Machine...
Page 29: ......
Page 30: ...11 Managing Jobs Job List Chapter 11 Managing Jobs Job List...
Page 49: ......
Page 50: ...12 Utility Chapter 12 Utility...
Page 143: ......
Page 144: ...13 Appendix Chapter 13 Appendix...
Page 149: ...13 Appendix 13 6 im7520 im6020 Appendix Chapter 13...
Page 150: ...Appendix 13 im7520 im6020 13 7 Appendix Chapter 13...
Page 151: ...13 Appendix 13 8 im7520 im6020 Appendix Chapter 13...
Page 152: ...Appendix 13 im7520 im6020 13 9 Appendix Chapter 13...
Page 153: ...13 Appendix 13 10 im7520 im6020 Appendix Chapter 13...
Page 156: ...14 Index Chapter 14 Index...
Page 163: ...4 Additional Copy Operations Chapter 4 Additional Copy Operations...
Page 199: ...5 Troubleshooting Chapter 5 Troubleshooting...
Page 215: ...6 Specifications Chapter 6 Specifications...
Page 224: ......
Page 225: ...7 Copy Paper Original Chapter 7 Copy Paper Original...
Page 261: ...8 Application Functions Chapter 8 Application Functions...
Page 381: ...1 Installation and Operation Precautions Chapter 1 Installation and Operation Precautions...
Page 397: ...2 Before Making Copies Chapter 2 Before Making Copies...
Page 451: ...3 Basic Copy Operations Chapter 3 Basic Copy Operations...