R
ACKS
Installation
& Operation
___ Drill for mounting holes
___ Wire stripper
___ Hammer (for removing knockouts)
___ Heat shrink tubing
___ Philips screwdriver
___ Pencil
___ Small flat screwdriver
___ Knife
___ Flat screwdriver
___ Conduit and fittings
___ Adjustable wrench
___ Urethane filler foam
___ Ratchet and assorted sockets
___ Digital voltmeter/RMS
___ Wire cutter
___ 110-style punch down tool (for Ethernet connections)
ote
: This is a basic list. You may need additional tools.
Tools List
The document provides installation instructions for all configurations of Capio Plus IGBT Dimmer Racks (ILSCP24 and ILSCP48).
Please read all instructions before installing this product.
The Capio Plus IGBT Dimmer Racks are shipped from the factory ready to install. The door, dimmer modules and the Rack Control
Module(s) may be shipped separately. The following steps are required to successfully install a Capio Plus IGBT Dimmer Rack:
Review this document completely
Familiarize yourself with the installation procedure before you start.
Unpack and inspect your equipment
Check for physical damage to container(s). Compare the equipment you received with your packing list.
Gather tools
You will need the tools listed below.
Pick an appropriate location for the rack
The rack should be installed on an industrial grade floor. The room in which it is installed should have sufficient volume to allow
exhaust air to circulate and cool. For more details and clearance requirements, refer to "Mechanical Considerations" on page 5 and con-
sult system drawings. For environmental considerations refer to "Specifications" on page 51.
Plan your wire routings and connection order
Decide where your line, load, and control wiring will enter the cabinet.
Cut openings and remove knockouts in the rack panels as required for conduit or busway entrance
Perform all conduit connections to the rack before it is permanently installed. Be sure to remove all knockout pieces and debris from
the cabinet. Seal all connections on the rack to allow for proper airflow.
Install Rack
Mount rack(s). Terminate all line, load, and control wires following the directions provided in this manual. Clean up work site and
rack(s) for check out by Philips Lighting Controls Technical Services.
Contact Philips Lighting Controls
Contact Philips Lighting Controls Technical Services when rack(s) is (are) installed and ready for Engineering Check Out. See "ENGI-
NEERING CHECK-OUT REQUEST FORM" at the end of this manual.
Installation Overview