3
UK
7.5.2 Determine probe length L for single probes........................................23
7.5.3 Shortening of the coaxial pipe ............................................................23
7.5.4 Determine probe length L for coaxial probes ......................................24
7.6.1 Installation to G¾ process connection directly in the tank lid .............25
7.6.2 Installation in the tank lid using a G¾ flange plate .............................25
7.6.3 Installation in open metal tanks ..........................................................26
8 Electrical connection ..........................................................................................29
9 Operating and display elements ........................................................................30
10 Menu ................................................................................................................31
10.2.2 EF level (extended functions) [II] ......................................................33
10.2.4 ENV level (environment) [IV] ............................................................34
11.2.1 Enter type of probe used ..................................................................37
11.2.4 Carry out tank adjustment .................................................................38
11.4.1 Set output function for OUT 1 ...........................................................39
11.4.2 Set switching limits (hysteresis function) ..........................................39
11.4.3 Set switching limits (window function) ..............................................39
11.4.4 Set switch-on delay for switching outputs .........................................40