26
►
Ensure cleanliness and evenness of the sealing areas; especially if the tank is
under pressure. Tighten the fixing screws sufficiently.
►
Lightly grease the sensor thread with a suitable paste.
►
Insert the unit into the process connection.
► Tighten it using a spanner. Tightening torque: 35 Nm.
7.6.3 Installation in open metal tanks
►
For installation in open metal tanks, use a metal fixture with G¾ process
connection to install the unit. It serves as a launching plate R; minimum size:
150 x 150 mm for a square fixture, 150 mm diameter for a circular fixture
►
If possible, mount the unit in the middle of the fixture. Adhere to the specified
installation distances according to
, if necessary, carry out tank
adjustment.
D1
R
D1:
R:
min. 150 mm.
launching plate (→ Accessories)
►
Lightly grease the sensor thread with a suitable paste.
►
Insert the unit into the process connection.
► Tighten it using a spanner. Tightening torque: 35 Nm.