N P Q R S T U V W X Y Z
A Frame Front View
A Frame Rear View
A B C D E F G H J K L M
1
2
3
4
5
6
7
8
9
10
11
12
13
14
J1
Pb
BATTERY ENBLD
(CB Must be on)
MDA
PWR
MDA
PWR
J1
Pb
BATTERY ENBLD
(CB Must be on)
A00H
A00S
J
0
1
J
0
2
J
0
3
J
0
1
J
0
2
J
0
3
This illustration shows the Fiber Quick Connect bracket features at A00H in the
front of the frame and A00S in the rear.
Level 03c, May 2011
Chapter 8. Cabling and connectivity
85
Summary of Contents for Z10 BUISNESS CLASS Z10 BC
Page 2: ......
Page 8: ...Level 03c May 2011 vi z10 BC IMPP...
Page 10: ...Level 03c May 2011 viii z10 BC IMPP...
Page 44: ...Level 03c May 2011 32 z10 BC IMPP...
Page 50: ...Level 03c May 2011 38 z10 BC IMPP...
Page 62: ...Level 03c May 2011 50 z10 BC IMPP...
Page 86: ...LC Duplex Connectors ISC 3 Links ISC 3 Links FC 18 02 ISC 3 Level 03c May 2011 74 z10 BC IMPP...
Page 106: ...Level 03c May 2011 94 z10 BC IMPP...
Page 110: ...Level 03c May 2011 98 z10 BC IMPP...
Page 112: ...Level 03c May 2011 100 z10 BC IMPP...
Page 116: ...Level 03c May 2011 104 z10 BC IMPP...
Page 130: ...Level 03c May 2011 118 z10 BC IMPP...
Page 131: ......
Page 132: ...Level 03c May 2011 Printed in USA GC28 6875 03...