Ethernet LAN switch support
I M P O R T A N T
You must install an Ethernet Switch to which the HMC(s) are connected. Only
an Ethernet switch may be connected to the customer ports J01 and J02 on
the Bulk Power Hub. To provide redundancy for the HMC(s), two switches
should be used.
The following is general information relevant to many Ethernet Switches. Refer to
the manufacturer’s User’s Guide that came with your Switch for installation
instructions.
The Switch is a standalone unit located outside the frame and which operates on
building AC power. The particular unit you have received is based on availability at
the time of shipment. A customer-supplied switch may be used as long as it
matches the specifications of the switch IBM supplies.
Typical Ethernet Switch characteristics:
v
16 auto-negotiation ports
v
10/100 Mbps data rate
v
Full or half duplex operation
v
Auto-MDIX on all ports
v
Port Status LEDs
v
100 to 240 VAC, 50 or 60 Hz power
Ethernet Switches supporting auto-MDIX on all ports use a straight-through cable
between any two ports.
Switch Example
Power
Link/Act
100M
FDX
1
2
3
4
5
6
7
8
9
10 11 12 13 14 15 16
SMC
EZ Switch 10/100
1016DT
R
1
2
3
4
9
10
11
12
13
14
15
16
5
6
7
8
Ethernet network connection requirements
I M P O R T A N T
On the z10 EC, the install team must connect the Ethernet adapters for
any HMC(s) into an Ethernet switch. This switch can then be connected
to J01 and J02 on the Bulk Power Hubs.
(See the illustration below).
IBM offers an Ethernet switch under Feature Code 0089. For z10 EC, the
default is a quantity of 0 for FC 0089. You must specify how many Ethernet
switch Feature Codes 0089 you want on your server order. You may also use
another manufacturer's switch, or an existing switch instead. Regardless of
whose switch you use, there must be a switch available to connect the
Hardware Management Consoles to your LAN.
To provide redundancy for the HMC(s), two switches should be used.
Level 03c, May 2011
52
z10 BC IMPP
Summary of Contents for Z10 BUISNESS CLASS Z10 BC
Page 2: ......
Page 8: ...Level 03c May 2011 vi z10 BC IMPP...
Page 10: ...Level 03c May 2011 viii z10 BC IMPP...
Page 44: ...Level 03c May 2011 32 z10 BC IMPP...
Page 50: ...Level 03c May 2011 38 z10 BC IMPP...
Page 62: ...Level 03c May 2011 50 z10 BC IMPP...
Page 86: ...LC Duplex Connectors ISC 3 Links ISC 3 Links FC 18 02 ISC 3 Level 03c May 2011 74 z10 BC IMPP...
Page 106: ...Level 03c May 2011 94 z10 BC IMPP...
Page 110: ...Level 03c May 2011 98 z10 BC IMPP...
Page 112: ...Level 03c May 2011 100 z10 BC IMPP...
Page 116: ...Level 03c May 2011 104 z10 BC IMPP...
Page 130: ...Level 03c May 2011 118 z10 BC IMPP...
Page 131: ......
Page 132: ...Level 03c May 2011 Printed in USA GC28 6875 03...