Site Installation Coordinator
Oversees the installation
Selects contractors and vendors
Sets and maintains the schedule
Site Selection
Utility availability
Environmental considerations
External access to the site
Internal access within the site
External and internal facilities
Expansion potential
Flooring
Non-raised floor construction
Floor coverings in data center
Static electricity
Vertical underfloor space
Sealed floor
Floor panel weight capacity
Pedestal system
Stringers
Grounding
Cabling provision
Expansion Potential
Raised floor construction
Space and Layout
Obstacles (walls, columns, etc)
Weight distribution
Floor loading
Machine area
Service clearance
Cable placement
Restrictive cable lengths
Power access
Safety equipment
Facilities access
Operator space and facilities
Work flow
Entrances/exits
Loading dock access
Hallways/doorways
Ramps
Lighting
Acoustics
Electro Magnetic Interference
Proximity to hazards
Potential water damage
Shock and vibration
Chemical hazards
Fire danger
Lightning protection
Office space
Storage space
Supplies space
Power Considerations
Dual power installation
Proper phase rotation
Proper wire size and color
Watertight power connectors
Proper grounding
Adequate circuit breakers
Emergency power shutoff
EPO switch
UEPO switch
Backup system power
Uniterruptible power supply
Surge protection
Brownout protection
Lightning protection
Emergency lighting
Service and utility outlets
Obvious labeling
Emergency Planning
Monitor environment
Computer room
Air conditioning equipment
Electrical supply
Periodic inspections
Hazard prevention/protection
Fire
Water
Lightning
Chemical
Personnel training
Emergency plans
Emergency equipment
Emergency shutdown
Emergency evacuation
Emergency contacts
Alarms
Disaster backup plans
Level 03c, May 2011
6
z10 BC IMPP
Summary of Contents for Z10 BUISNESS CLASS Z10 BC
Page 2: ......
Page 8: ...Level 03c May 2011 vi z10 BC IMPP...
Page 10: ...Level 03c May 2011 viii z10 BC IMPP...
Page 44: ...Level 03c May 2011 32 z10 BC IMPP...
Page 50: ...Level 03c May 2011 38 z10 BC IMPP...
Page 62: ...Level 03c May 2011 50 z10 BC IMPP...
Page 86: ...LC Duplex Connectors ISC 3 Links ISC 3 Links FC 18 02 ISC 3 Level 03c May 2011 74 z10 BC IMPP...
Page 106: ...Level 03c May 2011 94 z10 BC IMPP...
Page 110: ...Level 03c May 2011 98 z10 BC IMPP...
Page 112: ...Level 03c May 2011 100 z10 BC IMPP...
Page 116: ...Level 03c May 2011 104 z10 BC IMPP...
Page 130: ...Level 03c May 2011 118 z10 BC IMPP...
Page 131: ......
Page 132: ...Level 03c May 2011 Printed in USA GC28 6875 03...