Table 7. Clustered gateway installation checklist (continued)
U
Task
Description
Where to find information
h
1–5b
For OST, up to fifteen IP addresses were
assigned for use:
v
One for 3958-DD4 Server A
v
One for 3958-DD4 Server B
v
One for the TSSC
v
Up to twelve for the OST host network
Customer
h
1–6
One or more PCs on the customer's local area
network (LAN) are designated as ProtecTIER
Manager workstations.
Customer
h
1–7
A separate USB keyboard and graphics-capable
monitor have been provided for use during
installation.
Customer
h
1–8
If applicable, ensure that replication
configuration efforts are being coordinated
between the source and destination sites.
Customer, LBS, and or trained ProtecTIER
specialist.
Section 2: Install the gateway components
h
2–1
Have the customer suspend all I/O activity.
Power-off any components that are
powered-on, and shut down power to the
frames.
Refer to the component-specific documentation
for power-off instructions.
h
2–2
Install the WTI network power switch.
“Installing the WTI network power switch” on
page 31.
h
2–3
Install the 1 GB Ethernet switches.
“Installing the 1 Gb Ethernet switches” on page
33.
h
2–4
Install Server A (the bottom server).
“Installing the server” on page 30
h
2–5
Install Server B (the top server).
“Installing the server” on page 30
h
2–6a
If the customer purchased a new TSSC and
TSSC Ethernet switch, and has not yet installed
them, do so now, and then go to task 3-1.
The TSSC Maintenance Information (MI),
provided on the IBM System Storage TS7650
with ProtecTIER Publications CD.
h
2–6b
If the customer has an existing TSSC (with FC
2719) and Ethernet switch that can be used
with the gateway, go on to task 3-1.
N/A
Section 3: Apply cable labels and make cable connections
h
3–1
Label and connect one of the power cords on
the WTI network power switch to the PDU.
“Cabling a clustered gateway” on page 49.
h
3–2
Label and connect the power cord on each 1
GB switch to the PDU.
“Cabling a clustered gateway” on page 49.
h
3–3
Label and connect the remaining power cords
on the WTI network power switch to the
servers.
“Cabling a clustered gateway” on page 49.
h
3–4
If you installed a TSSC, label and connect the
power cord on the TSSC to the PDU.
“Cabling a clustered gateway” on page 49.
h
3–5
If you installed a TSSC Ethernet switch, label
and connect the power cord on the switch to
the PDU.
“Cabling a clustered gateway” on page 49.
Chapter 4. Installing the TS7650G hardware
27
|||
|
|
|
|
|
|
Summary of Contents for System Storage TS7650G 3958 DD4
Page 2: ......
Page 7: ...Russia Electromagnetic Interference EMI Class A Statement 189 Index 191 Contents v...
Page 8: ...vi IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 10: ...viii IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 12: ...x IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 16: ...xiv IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 30: ...xxviii IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 38: ...xxxvi IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 44: ...6 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 46: ...8 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 54: ...16 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 89: ...Figure 20 Clustered TS7650G power cabling Chapter 4 Installing the TS7650G hardware 51...
Page 120: ...82 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 148: ...110 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 150: ...112 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 156: ...118 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 172: ...134 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 192: ...154 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 198: ...160 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 210: ...172 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 220: ...182 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 228: ...190 IBM System Storage TS7600 with ProtecTIER Installation Roadmap Guide...
Page 231: ......
Page 232: ...Part Number 46X6052 Printed in USA or Mexico GC53 1154 09 1P P N 46X6052...