Table 4. Steps for different installation scenarios for Storwize V5000 Gen2 systems (continued)
New system
Existing system
Control enclosure only
Control enclosure and
one or more expansion
enclosures
Adding expansion
enclosures
Adding a control
enclosure and expansion
enclosures ( Storwize
V5030 only)
enclosure” on page 124
“Connecting Fibre
1
2
1
Complete these steps for each expansion enclosure that you add.
2
Complete these steps for each control enclosure and expansion enclosure that you add.
Be familiar with the following information
• See “Caution notices for the system” on page xvi and “Danger notices for the system ” on page xix for a
summary of the situations that can be potentially hazardous to you. Before installing, read and
understand the following caution and danger statements.
• Use safe practices when lifting. The fully populated enclosure weighs about 37 kg (82 lbs). At least
three people are required to lift and install the enclosure into the rack or to remove an enclosure from
the rack.
CAUTION: Use safe practices when lifting.
(27)
Also keep in mind that a rack full of equipment is extremely heavy.
DANGER: Heavy equipment–personal injury or equipment damage might result if mishandled.
(D006)
2 Storwize V5000 Gen2: Quick Installation Guide
Summary of Contents for Storwize V5000 Gen 2 Series
Page 1: ...IBM Storwize V5000 Gen2 Quick Installation Guide IBM...
Page 5: ...Index 149 v...
Page 6: ...vi...
Page 156: ...130 Storwize V5000 Gen2 Quick Installation Guide...
Page 164: ...138 Storwize V5000 Gen2 Quick Installation Guide...
Page 166: ...140 Storwize V5000 Gen2 Quick Installation Guide...
Page 168: ...142 Storwize V5000 Gen2 Quick Installation Guide...
Page 177: ......
Page 178: ...IBM...