12. Replace the cover, as described in “Installing or replacing the top cover: 2077-92F ” on page 58.
13. Slide the expansion enclosure back into the rack, as described in “Installing or replacing an
expansion enclosure in a rack: 2077-92F ” on page 47.
Installing or replacing a secondary expander module: 2077-92F
You can replace a faulty secondary expander module in a 2077-92F (5U) expansion enclosure. You may
also need to install a secondary expander module that was temporarily removed to perform other service
tasks.
Before you begin
DANGER:
Hazardous voltage present. Voltages present constitute a shock hazard, which can cause severe
injury or death. (L004)
CAUTION:
Hazardous energy present. Voltages with hazardous energy might cause heating when shorted
with metal, which might result in splattered metal, burns, or both. (L005)
CAUTION:
• Only an IBM Service Support Representative (SSR) can remove or replace the secondary
expander module from an enclosure (FRU P/N 01LJ112) that is powered on. If the 01LJ112
enclosure is powered on, use caution and avoid contact with the connectors on the main board.
• If the FRU part number of the enclosure is 01LJ607, you can remove or replace the secondary
expander module while the enclosure is powered on.
Important:
• You can replace a secondary expander module without powering off the expansion enclosure. However,
to maintain operating temperature, do not keep the cover off an operational enclosure for more than 15
minutes. The reduction in airflow through the enclosure might cause the enclosure or its components to
shut down to protect from overheating.
• Ensure that the FRU P/N for the replacement secondary expander module is appropriate for the
enclosure in which it is being installed.
About this task
As Figure 64 on page 64 shows, the 5U expansion enclosure contains two secondary expander modules.
In the figure,
A
shows the location of secondary expander module 1,
B
shows secondary expander
module 2, and
C
shows the front of the enclosure.
The secondary expander modules provide SAS connectivity between the expansion canisters and the
drives. Each drive has 2 SAS ports. SAS port 1 of each drive is connected to expansion canister 1 through
secondary expander module 2. SAS port 2 of each drive is connected to expansion canister 2 through
secondary expander module 1. If secondary expander module 2 is missing or is faulty, the expansion
Chapter 2. Installing the system hardware 63
Summary of Contents for Storwize V5000 Gen 2 Series
Page 1: ...IBM Storwize V5000 Gen2 Quick Installation Guide IBM...
Page 5: ...Index 149 v...
Page 6: ...vi...
Page 156: ...130 Storwize V5000 Gen2 Quick Installation Guide...
Page 164: ...138 Storwize V5000 Gen2 Quick Installation Guide...
Page 166: ...140 Storwize V5000 Gen2 Quick Installation Guide...
Page 168: ...142 Storwize V5000 Gen2 Quick Installation Guide...
Page 177: ......
Page 178: ...IBM...