Figure 40. Expansion canister
1
Canister fault indicator
2
Canister status
3
Canister power indicator
4
and
6
SAS link fault indicators
5
and
7
SAS link operational indicators
8
Canister release handles
Procedure
1. Disconnect the elbow of the lower cable management arm to swing it out of the way, as shown in
Figure 41 on page 49.
Follow the procedure that is described in “Moving the cable management arms” on page 52.
2. Carefully align the expansion canister with the expansion enclosure.
3. Rotate both the handles outward and insert the expansion canister into the expansion enclosure.
4. When the expansion canister is fully inserted, rotate each handle inward to lock it into position, as
shown in Figure 41 on page 49.
Figure 41. Install the expansion canister
5. Reconnect all the SAS cables to the appropriate SAS ports on the expansion canister, as described in
“Removing and installing a SAS cable: 2077-92F ” on page 72.
6. Reconnect the elbow of the lower cable management arm to the inner member of the slide rail.
Chapter 2. Installing the system hardware 49
Summary of Contents for Storwize V5000 Gen 2 Series
Page 1: ...IBM Storwize V5000 Gen2 Quick Installation Guide IBM...
Page 5: ...Index 149 v...
Page 6: ...vi...
Page 156: ...130 Storwize V5000 Gen2 Quick Installation Guide...
Page 164: ...138 Storwize V5000 Gen2 Quick Installation Guide...
Page 166: ...140 Storwize V5000 Gen2 Quick Installation Guide...
Page 168: ...142 Storwize V5000 Gen2 Quick Installation Guide...
Page 177: ......
Page 178: ...IBM...