Contents
Figures . . . . . . . . . . . . . . . v
Tables . . . . . . . . . . . . . . . vii
Safety and environmental notices . . . ix
Caution notices for the SAN Volume Controller.
Danger notices for SAN Volume Controller
Special caution and safety notices .
Inspecting the SAN Volume Controller system
for unsafe conditions .
Checking the grounding of a SAN Volume
Controller .
Emergency power-off shutdown .
Handling static-sensitive devices
SAN Volume Controller library and related
publications .
How to get information, help, and technical
assistance
SAN Volume Controller initial
installation overview
Chapter 1. Preparing to install the SAN
Volume Controller . . . . . . . . . . 1
Applicable machine types and models .
SAN Volume Controller operating environment.
Rack cabinet physical location
SAN Volume Controller 2145-SV1 front panel controls
and indicators .
SAN Volume Controller 2145-SV1
operator-information panel
SAN Volume Controller 2145-SV1 rear-panel
indicators
AC, DC, and power-supply error LEDs
SAN Volume Controller 2145-SV1 Ethernet port
LEDs .
SAN Volume Controller 2145-SV1 connectors .
SAN Volume Controller 2145-SV1 ports used
during service procedures
SAN Volume Controller 2145-SV1 unused ports
SAN Volume Controller 2145-SV1 Fibre Channel
and Ethernet port numbers .
Chapter 2. Installing the SAN Volume
Controller 2145-SV1 hardware. . . . . 15
Preparing for the SAN Volume Controller 2145-SV1
hardware installation .
Installing the SAN Volume Controller 2145-SV1 .
Installing the support rails: 2145-SV1 .
Installing the SAN Volume Controller 2145-SV1
in a rack .
Installing the cable management arm assembly
for the SAN Volume Controller 2145-SV1
Connecting the SAN Volume Controller 2145-SV1
to the SAN and to the Ethernet network.
Verifying the SAN Volume Controller 2145-SV1
installation
Chapter 3. Installing an optional 2U
SAS expansion enclosure
Installing support rails for 2U SAS expansion
enclosures .
Installing the optional 2U SAS expansion enclosure
into the rack .
Connecting the optional 2U SAS expansion
enclosures to the 2145-SV1 .
Combining 2U and 5U expansion enclosures .
Chapter 4. Installing an optional 5U
SAS expansion enclosure
Safety notices and considerations: 2145-92F .
Weight considerations: 2145-92F
Identify the hardware components: 2145-92F .
Unpacking and installing the enclosure: 2145-92F .
Removing the top cover: 2145-92F .
Installing or replacing the support rails: 2145-92F.
Installing or replacing an expansion enclosure in a
rack: 2145-92F
Installing or replacing an expansion canister:
2145-92F
Removing or moving the cable-management arm:
2145-92F
Moving the cable management arms .
Installing or replacing the cable-management arm:
2145-92F
Installing or replacing the top cover: 2145-92F .
Installing or replacing a drive: 2145-92F .
Installing or replacing a secondary expander
module: 2145-92F
Installing or replacing the fascia: 2145-92F .
Installing or replacing a power supply: 2145-92F .
Removing the fascia: 2145-92F .
Removing and installing a SAS cable: 2145-92F
© Copyright IBM Corp. 2014, 2017
iii
Summary of Contents for MTM 2145-12F
Page 8: ...viii SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Page 26: ...xxvi SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Page 72: ...38 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Page 192: ...158 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Page 194: ...160 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Page 196: ...162 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Page 200: ...166 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Page 208: ...174 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Page 212: ...178 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Page 213: ......
Page 214: ...IBM Printed in USA GI13 4547 02...