Figures
1. SAN Volume Controller 2145-SV1 front panel
2. SAN Volume Controller 2145-SV1
3. SAN Volume Controller 2145-SV1 rear-panel
6. SAN Volume Controller 2145-SV1 AC, DC, and
8. Ethernet ports on the system board
9. Ethernet port LEDs on the system board
10. Ethernet port LEDs on a 10 Gbps Ethernet
11. Connectors on the rear of the SAN Volume
13. SAN Volume Controller 2145-SV1 service ports 12
14. SAN Volume Controller 2145-SV1 unused
15. Fibre Channel port numbers in a typical
16. Ethernet port numbers for iSCSI
17. Parts provided for SAN Volume Controller
2145-SV1 hardware installation in a rack .
19. Detaching the inner rail section .
20. Attach inner rail section to chassis .
21. Install the bracket assembly to the frame
22. Insert the chassis into the rack .
23. Parts for installing the SAN Volume Controller
24. Reversing the orientation of the assembly
25. Install the inner member .
26. Install the outer member .
27. Install the other outer member .
28. Ethernet ports on the rear of the SAN Volume
30. SAN Volume Controller 2145-SV1 front panel
31. SAN Volume Controller 2145-SV1
32. Expansion enclosure support rails .
33. Installing the rail spring .
34. Hole locations in the front of the rack .
35. Opening the hinge brackets .
36. Closing the hinge brackets
37. Removing enclosure end caps
38. Inserting the enclosure into the rack .
39. SAS cable connector orientation .
41. Features on the front of the 2145-92F
42. Front fascia of the 2145-92F expansion
43. Features on the rear of the 2145-92F expansion
46. Tray containing expansion enclosure parts
49. Releasing the 2145-92F cover .
50. Removing the 2145-92F cover
52. Detaching the inner rail section .
53. Screw locations to attach the inner rail to the
54. Attaching the inner rail section to the
55. Installing the rail assembly to the rack frame
56. Example of required rack space .
57. Example installation of the enclosure in the
58. Replacing the 2145-92F enclosure in the rack
60. Install the expansion canister.
61. Upper and lower cable-management arms
62. Connectors for the upper cable management
63. Components of the lower CMA assembly
64. Upper and lower CMA assemblies moved
66. Release the upper CMA assembly .
67. Release the lower CMA assembly .
68. Upper and lower cable-management arms
69. Upper and lower cable-management arms
70. Connectors for the cable management arm
71. Install the inner connector of the upper CMA
to the inner member of the support rail .
72. Install the inner connector of the upper CMA
to the inner member of the support rail .
73. Attach the support rail connector of the upper
74. Comparing the location of the components of
75. Aligning the 2145-92F top cover.
76. Replacing the 2145-92F top cover .
79. Drive locations in a 2145-92F expansion
80. Correct drive installation .
81. Incorrect drive installation
83. Location of secondary expander modules
84. LEDs on a secondary expansion module
85. Open the secondary expander module handles 88
86. Replace the secondary expander module
87. Fascia components on the expansion enclosure 90
© Copyright IBM Corp. 2014, 2017
v
Summary of Contents for MTM 2145-12F
Page 8: ...viii SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Page 26: ...xxvi SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Page 72: ...38 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Page 192: ...158 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Page 194: ...160 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Page 196: ...162 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Page 200: ...166 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Page 208: ...174 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Page 212: ...178 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Page 213: ......
Page 214: ...IBM Printed in USA GI13 4547 02...