
4.5 Operating method from master device
4-17
4. Operation
This shows the PLC timing chart for operating the ELECYLINDER.
The basic process is as follows.
[Basic timing chart]
Category
Signal
abbreviation
Timing chart
Remarks
1
Power
Power ON
LED status: OFF
→
Orange ON
→
Green ON
24VDC power supply is turned ON.
2
Output
* ALM
Turns ON if no alarm has been
triggered.
3
Input
ST0
Δ
t1
When the [ST0] signal is turned
ON, home return operation begins.
4
Output
LS0
Δ
t2
Home return operation is complete
and the unit moves to the backward
end.
5
Input
ST1
Δ
t2
Moves to the forward end.
6
Output
LS1
Moved to the forward end.
7
Input
ST0
Δ
t2
Moves to the backward end.
8
Output
LS0
Moved to the backward end.
9
After this, "
5
" to "
8
" repeat.
Δ
t1: Wait approximately 0.5 seconds from when the *ALM signal turns ON before inputting the first command.
Δ
t2: The time taken for the ELECYLINDER actually to reach the forward or backward end after the LS signal turns ON.
Consider
Δ
t2 when giving instructions for the next operation from the PLC to the ELECYLINDER.
Δ
t2 becomes longer for larger detection ranges.
Δ
t2 also changes with the size of the transported load and acceleration/deceleration speeds.
Output
Input
ELECYLINDER
→
output signals to PLC
PLC
→
input signals to
ELECYLINDER
Power ON
Home return
Move to forward end
Move to backward end
Summary of Contents for EC-RR6*AH series
Page 9: ......
Page 28: ...Intro 19...
Page 130: ...1 100 1 Specifications...
Page 202: ...2 70 2 Installation...
Page 218: ...3 15 3 Wiring...
Page 240: ...4 21 4 Operation...
Page 328: ...9 15 9 External Dimensions...
Page 336: ...11 3 11 Warranty...
Page 337: ...Appendix 12 1 Index 12 1 12 2 Revision history 12 7 ELECYLINDER Chapter12...
Page 346: ......
Page 347: ......