USER
MANUAL
HC1151
M
AINTENANCE
C.3
7845436-01 11/18
subject to change without notice
GREASING CHART
Manual greasing of boom extensions' sliding surfaces
Frequency of greasing: 200 working hours / 180 days
Greasing under pressure of nipples
Frequency of greasing: 50 working hours / 40 days
Filling the reservoir for centralized automated greasing
Check the reservoir every 50 working hours and fill up if necessary
Not all greasing points can be reached from the ground. Therefore, use a ladder or another
suitable means. Do not climb on the crane.