Upper distributor
HYDRO
ION
®
VAS
– CS 1
Upper distributor
HYDRO
ION
®
VAS
– CS 1,5
(Di 50 mm)
VAS
– CS 2
(Di 63 mm)
Filling of filter vessel as below:
Step 1:
Fill the resin vessel to approximately one quarter
of its volume with clean water.
Step 2:
Fill the quartz gravel in the resin vessel.
A good distribution must be guaranteed!
Step 3:
Separate the resin and fill it in the vessels.
A good distribution must be guaranteed!
The respective quantity to be filled into the
vessels are shown in chapter
III
/ point 2.1 and
2.2 (table with technical data).
Step 4:
Clear any contamination, such as resin off the
threaded opening to the vessel, with clean water.
Step 5:
The closure of the nozzle rod must be removed
again.
Step 6:
The control together with top distributor must be
mounted on the vessels and the unit be aligned.
It has to be guaranteed that the nozzle rod can
be inserted into the opening of the control valves
without problem.
Step 7:
The prepared connections for incoming and soft
water must be connected.
Note:
All sealings (O-Ringe) at the vessel
connection of the control valves must not be
damaged and fit straightly.
to control valve
to control valve
nozzle rod
nozzle rod
fig.16
fig.18
fig.17