62/98
Last change 10/2018 E-P | Subject to technical modifications
Index chapter
VI
– Commissioning / Taking out of Service
Page
1.
Check prior to commissioning
63
2.
Start up of softener
64
Preparation
64
Programming of control unit
64
Backwash of softener / manual regeneration
65
Brine tank filling
65
Adjusting of soft water hardness
66
Blending at control valve HYDRO
ION
®
VAS - CS 1
66
Control of soft water hardness
66
3.
Taking out of operation
67
Extended out of operation period
67
Re-start
67