Page 36
7.7
Checking the installation
Assembling the vortex module wall
Have all electrical cable and plug connections been
properly tightened?Is the vortex module wall in accor-
dance with the nozzle arrangement data sheet? (please
note the number of modules in width and height)?
Vortex module wall assembly
Have all electrical cable and plug connections been
properly tightened?Are the guide rails built so that the
vortex wall module can be lifted or slid from the guide
rails?
Is it ensured after assembly that the floor pan is sho-
wing no leaks?
Have all electrical cable and plug connections been
properly tightened?With a wall height of 11 modules is
the Vortex-Vortex-module supported by two side rails.
With16 Vortex modules is it vertically split and sup-
ported individually by side rails?
Droplet separator assembly
Are the guide rails built so that separator can be lifted or
slid from the guide rails?
Is it ensured after assembly that the floor pan is sho-
wing no leaks? Are all electrical plug connections
secure?
Mounting of the distributor pipe / tubing
Has the seating of the individual hoses on their connec-
tors been checked by pulling gently on them? Are all
electrical plug connections secure?
Is the arrangement of the nozzles and tubing in accor-
dance with to the supplied nozzle arrangement data
sheet?
Pump station installation
Is the pump station fixed horizontally on a suitable wall?
Does the mains voltage match the voltage on the name
plate/delivery note?
Summary of Contents for LPS
Page 1: ...LPS Humidifies and Cools ÁLPS Ä4 3Ö ENhÈ LPS 20130619 EN Operating manual ...
Page 37: ...Page 37 8 Dimensions Pump Station View from below Side view Rear view ...
Page 62: ...Page 62 14 2 3 1 Menu structure and parameter setting 4 3 ...
Page 63: ...Page 63 15 EC declaration of conformity ...
Page 69: ...Page 69 4 3 ...