![HydroMatik LPS Operating Manual Download Page 26](http://html.mh-extra.com/html/hydromatik/lps/lps_operating-manual_2192297026.webp)
Page 26
7.4.2
Assembling the distributor pipe
The high-pressure water coming from pump station first enters a
manifold and is routed from there to the nozzle.
The manifold is mounted according to the nozzle assembly
sheet (project specific) produced by HygroMatik on the vortex
wall.
Each nozzle in the vortex wall is connected to the manifold with
a hose. Each nozzle must be higher than the corresponding port
on the manifold - the water hose must have a constant slope
Installation:
»
A manifold is mounted on the inlet side to at least two
vortex modules.
»
Determine distributor pipe position (1) on vortex wall in
accordance with nozzle data sheet.
»
Place retaining clips (3) on the appropriate position on
Vortex Modules.
»
Put screw (2) through by retaining clip Vortex Module.
»
Tighten nut (4) with washer (5) on the rear of the Vortex
Module where the screw stands proud.
»
Repeat this process for all the holding clamps.
»
Press manifold (1) into the holding clamps (see figure
C) and check for tightness.
1
C
4
5
2
B
2
2
3
A
Summary of Contents for LPS
Page 1: ...LPS Humidifies and Cools ÁLPS Ä4 3Ö ENhÈ LPS 20130619 EN Operating manual ...
Page 37: ...Page 37 8 Dimensions Pump Station View from below Side view Rear view ...
Page 62: ...Page 62 14 2 3 1 Menu structure and parameter setting 4 3 ...
Page 63: ...Page 63 15 EC declaration of conformity ...
Page 69: ...Page 69 4 3 ...