HydroMassage Owner’s Manual, Revision 10-25-15
JTL Enterprises, Inc 1-727-536-5566 • www.HydroMassage.com
Page 13 of 33
Before beginning installation, the following components should be ready:
Also, the following items should be ready:
•
T-Max controller (if applicable)
•
Any additional items as specified on the invoice
**THIS IS THE END OF THE DELIVERY / UNPACKING INSTRUCTIONS.
INSTALLATION INSTRUCTIONS BEGIN ON NEXT PAGE**
2 Parts Supply
Box
Touch Screen
Computer
External Cooling
System (If applicable)
External Cooling
System Crate
External Cooling
System