12 SERVICE WORK ON THE CHASSIS
49
F00373-10
–
Secure wiring harness and clutch line with cable holder.
–
Position the voltage regulator, and mount and tighten screws
.
Guideline
Remaining screws, chassis
M6
10 Nm (7.4 lbf ft)
–
Secure the wiring harness with the cable holder in front of the right radiator.
H01672-10
–
Position the fork legs.
Bleeder screws
are positioned toward the front.
Info
The rebound damping is located in right fork leg
REB
(red adjusting
screw). The compression damping is located in left fork leg
COM
(white
adjusting screw).
Grooves are milled into the side of the upper end of the fork legs. The sec-
ond milled groove (from the top) must be flush with the top edge of the
upper triple clamp.
F00318-11
–
Tighten screws
.
Guideline
Screw, bottom triple clamp
M8
15 Nm (11.1 lbf ft)
F00281-10
–
Tighten screw
.
Guideline
Screw, top steering head
M20x1.5
12 Nm (8.9 lbf ft)
F00281-11
–
Mount and tighten screw
.
Guideline
Screw, top steering stem
M8
17 Nm
(12.5 lbf ft)
Loctite
®
243™
F00318-10
–
Tighten screws
.
Guideline
Screw, top triple clamp
M8
17 Nm (12.5 lbf ft)
Summary of Contents for FE 450
Page 1: ...OWNER S MANUAL 2017 FE 450 FE 501 Art no 3402103en ...
Page 2: ......