Figure 3-6
Removing the server from the holding rails
4.
Place the removed server on an ESD platform.
Step 5
Remove the front end of the holding rail.
1.
Hold down the plate on the front end of the holding rail and pull out the hook. See (1)
and (2) in
2288H V5 Server
User Guide
3 Basic Operations
Issue 04 (2018-09-04)
Copyright © Huawei Technologies Co., Ltd.
48