UPS5000-E-(25 kVA-75 kVA)-SM
User Manual (Half Height)
5 Operations
Issue 03 (2019-12-13)
Copyright © Huawei Technologies Co., Ltd.
140
Step 3
Set
Sched. shallow dis. test time
,
Sched. shallow dis. test interval
and
Shallow dis. test dis.
ratio (%)
. After setting is complete, the system will perform automatic shallow discharge
tests based on the settings.
Figure 5-10
Automatic shallow discharge settings
----End
Manual Shallow Discharge Test
Step 1
Log in to the WebUI.
Step 2
On the
Monitoring
>
Control
>
System Commands and Tests
page, click
Start
next to
Shallow discharge test
to start a shallow discharge test.