UPS5000-E-(25 kVA-75 kVA)-SM
User Manual (Half Height)
3 Installation
Issue 03 (2019-12-13)
Copyright © Huawei Technologies Co., Ltd.
53
Figure 3-13
Securing a guide rail (front view)
Step 2
Install one reinforced beam on the front and at the rear of the rack respectively. Then tighten
the panel screws.
Figure 3-14
Installing a reinforced beam (front view)
Step 3
Install four floating nuts respectively on the left and right mounting bars on the front of the
rack.
1.
Use a scale plate to determine the installation positions of floating nuts.