UPS5000-E-(25 kVA-75 kVA)-SM
User Manual (Half Height)
3 Installation
Issue 03 (2019-12-13)
Copyright © Huawei Technologies Co., Ltd.
71
3.3 Installing a Parallel System
3.3.1 Installing the UPSs
Context
When installing multiple cabinets, install connecting kits to combine and secure the
cabinets.
Front and back connecting kits are different, and related Power Cable DT are different,
details as below picture showed.
Procedure
Step 1
Install the UPSs in a parallel system using the single UPS installation method.
Step 2
Install connecting kits for the cabinets.
Figure 3-38
Installing connecting kits
Screw 1 is the pan head screw, and Screw 2 is the countersunk head screw.