500 meters from the coast or prone to sea breeze. The regions prone to sea
breeze vary with weather conditions (such as typhoons and monsoons) or
terrains (such as dams and hills).
Mounting Structure Requirements
●
The mounting structure where the inverter is installed must be fire resistant.
●
Do not install the inverter on flammable building materials.
●
The inverter is heavy. Ensure that the installation surface is solid enough to
bear the weight load.
●
In residential areas, do not install the inverter on drywalls or walls made of
similar materials which have a weak sound insulation performance because
the noise generated by the inverter is noticeable.
Figure 4-1 Mounting structure
4.3.2 Space Requirements
●
Reserve enough clearance around the inverter and select an appropriate
installation angle to ensure sufficient space for installation and heat
dissipation.
Figure 4-2 Installation space
SUN2000-(196KTL-H0, 200KTL-H2, 215KTL-H0)
Series
User Manual
4 Installation
Issue 07 (2021-07-08)
Copyright © Huawei Technologies Co., Ltd.
22