16
WFS 101545 Operations Manual
Ease the chiller into a position where all four unions line up with the mating parts.
The union faces must be “flat” to one another.
Verify that the O-rings are in place
.
Tighten the union.
Install washers and nuts on the carriage bolts and tighten.
Connect the Power Cord and the Solenoid Control Cord to the round receptacles on
the bottom of the Control Panel. See Figure 4-6
f.
Facility Interface
i.
Plumbing Connections
There are six (6) facility plumbing connections to the WFS Unit.
Make-up Water for the Spindle Coolant Circuit
Make-up Water for the process Cooling circuit
FIGURE 4-6