11
WFS 101545 Operations Manual
4)
SETUP
a.
Floor Space
Prior to installation consider the space required for proper servicing. Figure 4-1 provides
recommended clearances for servicing the various components on the WFS 101545.
b.
Uncrating
NOTE:
Inspect “Tip and Tell” and shock indicators mounted on the outside of the crates for
indication of mishandling and potential damage during shipment.
The outside of the crate should be inspected for damage prior to uncrating. Additionally,
“Tip and Tell” and shock indicators are attached to the exterior. They should be inspected
prior to uncrating. If these indicators are missing or indicate that the crate has been
subjected to damaging shock loads or tipped, you should notify your carrier prior to
uncrating.
The refrigeration unit is shipped in the smaller crate. The WFS base assembly and the
Isolation Valve Sub-Assembly are both contained in the larger crate.
Inspect both crates and report any damage to the carrier and the OEM before proceeding.
AREA FOR SERVICING
FILTERS
AREA FOR SERVICING RESIN
TANKS
AREA
FOR
FACILITY
PLUMBI
NG
AREA
FOR
SERVICIN
G
RECOMMENDED FLOOR SPACE FOR SERVICING THE WFS 101545
36”
914m
39”
1000m
m
39”
1000m
m
39”
1000m
FIGURE 4-1
84”
2134m
m
39”
1000m