i
Contents
Cleanliness ················································································································································· 3
EMI ····························································································································································· 3
Laser safety ················································································································································ 4
Installation tools ················································································································································· 4
Installation accessories ······································································································································ 4
Installing the switch ························································································· 6
Installing the switch in a 19-inch rack ················································································································ 6
Mounting brackets ······································································································································ 6
Attaching the mounting brackets to the switch ··························································································· 7
Rack-mounting the switch ·························································································································· 9
Mounting the switch on a workbench ··············································································································· 10
Grounding the switch ······································································································································· 11
Grounding the switch with a grounding strip ···························································································· 11
Grounding the switch with a grounding conductor buried in the earth ground ········································· 12
Grounding the switch by using the PE wire of the AC power cord ··························································· 13
Installing and removing a power supply (HPE 5130 24G SFP 4SFP+ EI switch) ············································ 13
Installing a power supply ·························································································································· 14
Removing a power supply ························································································································ 14
Connecting the power cord ······························································································································ 15
Connecting the switch to an AC power source ························································································ 16
Connecting the switch to a –48 VDC power source ················································································· 17
Connecting the switch to an RPS ············································································································· 18
Verifying the installation ··································································································································· 19
Accessing the switch for the first time ··························································· 20
Setting up the configuration environment ········································································································ 20
Connecting the console cable ·························································································································· 20
Setting terminal parameters ····························································································································· 21
Powering on the switch ···································································································································· 21
Setting up an IRF fabric ················································································ 22
IRF fabric setup flowchart ································································································································ 22
Planning IRF fabric setup ································································································································· 23
Planning IRF fabric size and the installation site ······················································································ 23
Identifying the master switch and planning IRF member IDs ··································································· 23
Planning IRF topology and connections ··································································································· 23
Identifying physical IRF ports on the member switches ··········································································· 24
Planning the cabling scheme ··················································································································· 24
Configuring basic IRF settings ························································································································· 26
Connecting the physical IRF ports ··················································································································· 26
Verifying the IRF fabric setup ··························································································································· 27
Maintenance and troubleshooting ································································· 28
Fixed power supply failure ······························································································································· 28
AC input failure ········································································································································· 28
RPS DC input failure ································································································································ 28
Concurrent RPS and AC input failure ······································································································ 29
Hot-swappable power supply failure ················································································································ 30
Symptom ·················································································································································· 30
Solution ···················································································································································· 30
Configuration terminal problems ······················································································································ 30
No display on the configuration terminal ·································································································· 30