4
•
Keep the switch far away from radio transmitting stations, radar stations, and high-frequency
devices to make sure the EMI levels do not exceed the compliant range.
•
Use electromagnetic shielding when necessary. For example, use shielded interface cables.
•
To prevent signal ports from getting damaged by over-voltage or over-current caused by
lightning strikes, only route interface cables indoors.
Laser safety
WARNING!
Do not stare into any fiber port when the switch has power. The laser light emitted from the optical
fiber might hurt your eyes.
The HPE FlexNetwork 5130 EI switches are Class 1 laser devices.
Installation tools
•
Flat-blade screwdriver
•
Phillips screwdriver
•
ESD wrist strap
All these installation tools are user supplied.
Installation accessories
Table 3 Installation accessories
Product
code
Description Quantity
Applicable
models
5066-0850
1 U four-hole mounting
bracket kit (including one
pair of mounting brackets
and eight M4 countersunk
screws)
1 kit
•
HPE 5130 24G PoE+ 4SFP+ (370W) EI
•
HPE 5130 48G 4SFP+ EI
•
HPE 5130 48G PoE+ 4SFP+ (370W) EI
•
HPE 5130 24G SFP 4SFP+ EI
•
HPE 5130 48G 2SFP+ 2XGT EI
•
HPE 5130 24G PoE+ 2SFP+ 2XGT (370W)
EI
•
HPE 5130 48G PoE+ 2SFP+ 2XGT (370W)
EI
•
HPE 5130 48G 4SFP+ EI BR
•
HPE 5130 24G PoE+ 4SFP+ (370W) EI BR
•
HPE 5130 48G PoE+ 4SFP+ (370W) EI BR
5184-6978
1 U two-hole mounting
bracket kit (including one
pair of mounting brackets
and four M4 countersunk
screws)
1 kit
•
HPE 5130 24G 4SFP+ EI
•
HPE 5130 24G 2SFP+ 2XGT EI
•
HPE 5130 24G 4SFP+ EI BR
N/A
M6 screw and floating nut
User
supplied
All HPE 5130 EI switches