62
grounding switch with grounding conductor
buried in the earth ground,
grounding switch with grounding strip,
grounding the switch,
identifying IRF master switch,
identifying IRF member switch physical
ports,
installing switch,
installing switch on 19-inch rack,
mounting switch on workbench,
planning IRF connections,
planning IRF fabric installation site,
planning IRF member IDs,
planning IRF topology,
removing power supply,
securing AC power cord for fixed AC power
supply,
securing AC power cord for hot-swappable AC
power supply,
setting up IRF fabric,
troubleshooting fixed power supply failure,
troubleshooting garbled terminal display,
troubleshooting hot-swappable power supply
failure,
troubleshooting no terminal display,
troubleshooting the switch,
R
rack
attaching mounting bracket to switch
chassis,
mounting switch to workbench,
mounting the switch,
switch installation on 19-inch rack,
verifying switch installation (19-inch rack),
removing
power supply,
RPS
LED,
S
safety
EMI prevention,
grounding switch through AC power supply
PE wire,
grounding the switch,
grounding the switch with grounding
conductor buried in the earth ground,
grounding the switch with grounding strip,
installation site cleanliness,
installation site dust concentration,
installation site gas saturation,
installation site humidity,
installation site temperature,
laser safety recommendations,
recommendations,
setting
IRF fabric,
switch configuration environment,
terminal parameters,
SFP+
port LED,
site
cleanliness,
dust concentration,
examining installation site,
gas saturation,
IRF fabric installation site planning,
stop bits (parameter),
switch
attaching mounting bracket to switch chassis,
connecting console cable,
connecting IRF physical ports,
cooling system,
first time access,
FRUs,
grounding,
grounding through AC power supply PE wire,
grounding with grounding conductor buried in the
earth ground,
grounding with grounding strip,
identifying IRF master switch,
identifying IRF member switch physical ports,
planning IRF cabling scheme,
,
planning IRF member IDs,
ports,
powering on,
rack-mounting,
setting configuration environment,
setting terminal parameters,
setting up IRF fabric,