60
securing AC power cord for hot-swappable AC
power supply,
troubleshooting fixed power supply failure,
troubleshooting hot-swappable power supply
failure,
electromagnetic interference.
See
emulation (parameter),
environment
examining installation site,
site dust concentration,
site gas saturation,
site humidity,
site temperature,
examining installation site,
F
fiber
laser safety recommendations,
fixed AC power supply
securing AC power cord,
fixed power supply
failure (troubleshooting),
securing AC power cord,
flow control (parameter),
flowchart of IRF fabric setup,
G
garbled terminal display (troubleshooting),
gas (installation site),
grounding
EMI prevention,
grounding conductor buried in the earth
ground,
grounding strip,
switch through AC power supply PE wire,
switch with grounding conductor buried in the
earth ground,
switch with grounding strip,
H
hardware
10/100/1000 Base-T Ethernet port LED
technical specifications,
10/100/1000 Base-T Ethernet port technical
specifications,
100/1000Base-X SFP port LED technical
specifications,
100/1000Base-X SFP port technical
specifications,
combo interface technical specifications,
connecting AC power source,
connecting RPS,
console port technical specifications,
grounding switch,
grounding switch through AC power supply PE
wire,
grounding switch with grounding conductor buried
in the earth ground,
grounding switch with grounding strip,
port mode LED technical specifications,
port technical specifications,
power supply installation,
power supply removal,
power supply status LED technical
specifications,
rack-mounting the switch,
RPS status LED technical specifications,
securing AC power cord for fixed AC power
supply,
securing AC power cord for hot-swappable AC
power supply,
SFP+ port LED technical specifications,
SFP+ port technical specifications,
switch installation on 19-inch rack,
system status LED,
verifying switch 19-inch rack installation,
workbench switch mounting,
hot-swappable AC power supply
securing AC power cord,
hot-swappable power supply
failure (troubleshooting),
securing AC power cord,
humidity (installation site),
I
ID (IRF member),
identifying
IRF master switch,
IRF member switch physical ports,
installing
accessories,
examining installation site,
IRF fabric installation site planning,
power supply,
,
safety recommendations,
site humidity,
site temperature,