Installing and Configuring the Edge Switch 2/32
36
Edge Switch 2/32 Installation Guide
Unpack, Inspect, and Install the Switch
This section provides instructions for unpacking and inspecting the Edge
Switch 2/32 and installing it in a desktop or rack-mount configuration.
Unpack and Inspect the Switch
Unpack and inspect the switch:
Caution:
When you remove the switch from the carton, do not rest it on its
rear window while examining it. To do so may break the FRU handles.
1. Inspect the shipping containers for damage caused during transit. If a
container is damaged, ensure a representative from the freight carrier is
present when the container is opened.
2. Unpack the shipping containers and inspect each item for damage. Save all
shipping and packing materials. Ensure that all items on the enclosed shipping
list are in each container.
3. If any items are damaged or missing, customers should contact an HP
authorized service provider or reseller.
Desktop Installation
To install and configure the switch on a desktop:
1. Remove the backing from the four adhesive rubber pads and apply the pads to
the underside of the switch. Ensure the pads are aligned with the scribed
circles at each corner.
2. Position the switch on a table or desktop as directed by the customer. Ensure:
■
Grounded AC electrical outlets are available.
■
Adequate ventilation is present.
■
Areas with excessive heat, dust, or moisture are avoided.
■
All planning considerations are met. Refer to the
HP StorageWorks SAN
High Availability Planning Guide
.
3. Verify that all FRUs are installed as ordered.
Summary of Contents for storageworks 2/32
Page 10: ...Contents 10 Edge Switch 2 32 Installation Guide ...
Page 18: ...About this Guide 18 Edge Switch 2 32 Installation Guide ...
Page 86: ...Installing and Configuring the Edge Switch 2 32 86 Edge Switch 2 32 Installation Guide ...
Page 112: ...Manage Firmware Versions 112 Edge Switch 2 32 Installation Guide ...
Page 119: ...Regulatory Compliance Notices 119 Edge Switch 2 32 Installation Guide Japanese Notice ...
Page 124: ...Regulatory Compliance Notices 124 Edge Switch 2 32 Installation Guide ...