Hardware options installation 35
d.
Route the cables underneath the metal tabs.
12.
Install the drives, based on the drive numbering (on page
14
) sequence. Start from the drive bay with
the lowest number in box 1.
13.
If installing a 4-bay LFF hot-plug drive cage in box 2, remove the drive cage blank.