![HP ProLiant ML110 Gen9 User Manual Download Page 29](http://html.mh-extra.com/html/hp/proliant-ml110-gen9/proliant-ml110-gen9_user-manual_164839029.webp)
Setup 29
Installing hardware options
Install any hardware options before initializing the server. For options installation information, refer to the
option documentation. For server-specific information, refer to "Hardware options installation (on page
33
)."
Setting up a tower server
Follow the steps in this section to set up a tower server.
1.
Place the server on a flat, stable surface.
2.
Connect peripheral devices to the server. ("
Rear panel components
" on page
9
)
WARNING:
To reduce the risk of electric shock, fire, or damage to the equipment, do not plug
telephone or telecommunications connectors into RJ-45 connectors.
3.
Connect the power cord to the rear of the server.
4.
Connect the power cord to the AC power source.
WARNING:
To reduce the risk of electric shock or damage to the equipment:
•
Do not disable the power cord grounding plug. The grounding plug is an important safety
feature.
•
Plug the power cord into a grounded (earthed) electrical outlet that is easily accessible at all
times.
•
Unplug the power cord from the power supply to disconnect power to the equipment.
•
Do not route the power cord where it can be walked on or pinched by items placed against it.
Pay particular attention to the plug, electrical outlet, and the point where the cord extends from
the server.
Installing the server into a rack
To install the server into a rack with square, round, or threaded holes, refer to the instructions that ship with
the rack hardware kit.
If you are installing the server into a telco rack, order the appropriate option kit at the RackSolutions website
(
http://www.racksolutions.com/hp
). Follow the server-specific instructions on the website to install the rack
brackets.
Use the following information when connecting peripheral cables and power cords to the server.
WARNING:
This server is very heavy. To reduce the risk of personal injury or damage to the
equipment:
•
Observe local occupational health and safety requirements and guidelines for manual
material handling.
•
Get help to lift and stabilize the product during installation or removal, especially when the
product is not fastened to the rails. HP recommends that a minimum of two people are required
for all rack server installations. A third person may be required to help align the server if the
server is installed higher than chest level.
•
Use caution when installing the server in or removing the server from the rack; it is unstable
when not fastened to the rails.
Summary of Contents for ProLiant ML110 Gen9
Page 92: ...Cabling 92 FBWC module on a P840 controller HP Smart Storage Battery cabling ...
Page 94: ...Cabling 94 Optional system upgrade fan 92 x 38 mm PCI fan ...
Page 97: ...Cabling 97 Front I O cabling Front USB 3 0 cabling ...
Page 127: ...Support and other resources 127 ...
Page 128: ...Support and other resources 128 ...