
Preventive Maintenance
Flame ionization detector (FID)
172
Jet exchange/replacement
Depending upon the column type to be used, and/or analyses to be
performed, exchanging the jet in an FID may be necessary.
Flame Ionization Detector
Figure 8-9
Note:
The proper jet must be installed prior to column installation.
If switching from packed column operation to capillary operation, the jet
for capillary use
must
be installed prior to column installation.
Depending upon the column type to be installed (packed versus
capillary), the proper jet must be installed. Table 8•1lists available jets:
Summary of Contents for 5890 Series II
Page 1: ...Reference Manual HP 5890 Series II and HP 5890 Series II Plus ...
Page 8: ...This page intentionally left blank ...
Page 9: ...1 Columns and Fittings ...
Page 31: ...2 Keyboard and Displays ...
Page 42: ...This page intentionally left blank ...
Page 43: ...3 Temperature Control ...
Page 57: ...4 Electronic Flow Sensing ...
Page 66: ...This page intentionally left blank ...
Page 67: ...5 Signal Output ...
Page 98: ...This page intentionally left blank ...
Page 99: ...6 Inlet Systems ...
Page 123: ...7 Detector Systems ...
Page 155: ...8 Preventive Maintenance ...
Page 201: ...9 Chromatographic Troubleshooting ...
Page 222: ...This page intentionally left blank ...
Page 223: ...10 Test Sample Chromatograms ...