
Honeywell
CD3200 up to110A
User’s Manual ver. 2.0
www.honeywell.com/imc 46
10.3.24 Password
Parameter 123
Operations:
Write
Meaning:
If properly setted, gives the access to configuration.
10.3.25 Actual power
Parameter 124
Operations
: Read
10.3.26 Feed-Back
Parameter 125L
Operations:
Read
10.3.27 Soft start time
Parameter 125H
Operations:
Read/Write
Meaning:
Time
Soft Start Time
Par 125H x 5msec
OUT
It’s corresponds to the value in points (0 – 255, 0 – FF Hex).
Each step is 5msec .
The unit starts in phase angle mode with a ramp starting from
zero up to full voltage in a presetted and Adjustable time.
The time is setted by this parameter.
10.3.28 Delay time HB
Parameter 126L
Operations:
Read/Write
Meaning:
It’s a value in point (0 – 255, 0 – FF Hex).
Each step is 50msec.
It represents a delay time before to have HB alarm active.
When is used with soft start, this time must be longer than soft start time.
Par126H x 50msec > Par125H x 5msec
10.3.29 % HB
Parameter 126H
Operations:
Read/Write
Meaning:
It corresponds to a value in point (0-255, 0-FF Hex)
The maximum load current (100%) minus this parameter (x%) is the value establishing the HB
current set point.
Example:
Load current
= 10A
Parameter 124H
= 20% 51 Dec
33 Hex
Parameter 2 will be setted at 8A.