
112
6-7
C
B
A
1
2
3
STOP
Maintenance
6.3
Monitor Calibration
Follow the fi gures
6.7
(
1
,
2
,
3
).
Keeping the
STOP
key pressed for more than 3
seconds in the Introduction screen the calibration
process starts. The process is performed in 3 stages.
The operator must touch in three different times the
cross indicator displayed on the screen.
First stage;
•
Touch the top left dot (
A
).
Second stage;
•
Touch the middle right dot (
B
).
Third stage;
•
Touch the centre bottom dot (
C
).
At the end of the calibration process, the machine
restarts automatically.
The Touch Screen is now operational.
..
..
..
.
..
. .
..
.