ADI CD Boiler – Technical Manual
25
11. CONTROL OF SEVERAL BOILERS – CASCADED SYSTEM
In an installation with several boilers it is important that the power generated by the boilers adapts at any
moment to the demand of the installation, always optimizing the generators’ efficiency.
11.1 Boilers sequence included
When there are several boilers
supplying
the
same
installation, the boiler LMS
control unit is able to make a
sequence up to 16 boilers
equipped with this controller.
The boiler with device address
1 assumes the role of the
cascade master.
It
activates
the
required
functions
and
shows
the
additional menus with the
parameters for use with the
cascaded system.
Components and actions
For each boiler the following components and actions are necessary:
•
Add an additional module OCI345.06/101 (consult the current pricelist) of communication bus type LPB
•
Connect the additional module to the boiler control unit, by means of the bus cable included in the OCI345
(see the photo attached).
•
Make a serie between each OCI345 of the boilers connecting (DB – LPB data bus and MB – LPB ground).
7
4
7
1
z1
1
9
/1
11
0
(A)
(B)
(A) Cascade Module OCI345.06/101 (B) Cascade Cable LPB
(A)
(B)
Summary of Contents for ADISA ADI CD 105
Page 1: ...TECHNICAL MANUAL OF INSTALLATION USE AND MAINTENANCE 4 2020 uk ADI CD CONDENSING BOILER...
Page 7: ...ADI CD Boiler Technical Manual 7 Models ADI CD 200 and higher...
Page 31: ...ADI CD Boiler Technical Manual 31 12 1 Electric drawing ADI CD 70 750...
Page 32: ...ADI CD Boiler Technical Manual 32 12 2 Electric drawing ADI CD 850 950...
Page 69: ...www adisaheating com ADISA HEATING HIPLUS AIRE ACONDICIONADO S L...