17.7.5 Water quality of the installation
It is important to follow the instructions indicated in the present manual. The primary circuit of an installation,
being a closed circuit, can not be refilled with non-treated water.
Periodical refillings with non-treated water could cause a constant input of:
-
Oxygen and dissolved gases (contributing to produce oxidation and corrosion in the installation). This
problem can be minimized by installing an air/gas venting in the higher part of the water flow connection or
in a common flow pipe.
-
Carbonates (contributing to produce scaling in the boilers).
Due to this reason, water refillings must be reduced to the minimum, and a water meter must be installed in the
refilling of the primary circuit.
It is necessary to take the appropriate precautions with respect to the quality of the water circulating, in order to
avoid corrosion and oxidation of the installation and allow equipments to operate at their maximum
performances:
a. Water characteristics
These are the values of the circuit water and of the refilling water.
Concept
VALUE
Concept
VALUE
Total
hardness
(TH)
Lower than 12 ºF
Maximum volume allowed
of refilling water in the
installation (m3)
0.04 x P output / (TH x 0.1)
being:
P output: power output total sum in kW
TH: water hardness in ºF, Ca(HCO3)2
Chloride
Lower than 100 mg/l
Salinity
Lower than 50 mg/litre
pH
between 8 and 10
Conductivity
Lower than 500 µS/cm
Resistivity
Higher than 2.000 Ohms x cm
Iron
Lower than 1 mg/litre
b.
A WATER TREATMENT IS ABSOLUTELY INDISPENSABLE FOR THE INSTALLATION OF THE PRIMARY
CIRCUIT IN THE FOLLOWING CASES:
1.
Big installations (with high water contents).
2.
Characteristics of the refilling water different from the hardness (TH) indicated in the previous table.
3.
Frequent refillings of the installation with new water (because of drainings, water leaks, repairing),
even if the water has a hardness lower than 12ºF.
4.
When the maximum volume allowed of refilling water is exceeded (see table).
c. A mesh filter should be installed before each boiler (mesh of 0.3 mm).
d. Air purging/venting:
If the boilers circuit has a Low Loss Header: place an air vent of big capacity in its higher point.
Otherwise: it would be necessary to install an air vent of big capacity or corrosion inhibitor equipment in a high
point of the circuit behind the boilers.
e. Old installations
e1) Before replacing the existing boilers with new boilers, proceed to clean the installation.
If a chemical product is used, it must be compatible with the installation materials.
Drainage must be made from a low point of the installation, if possible different from the boilers’draining point.
e2) A separator of oxides and sludge must be installed in the circuits’return, so that all the return water flow can
pass through it, allowing its draining without suspending the service.
Apply the considerations of paragraphs “a,b,c,d”.
IMPORTANT :
For circuits in very bad conditions and the previous measures taken were not sufficient, or the cleaning of the
installation was not efficient, or a new installation with a big circuit (great water volume) the solution would be to
separate the boilers circuit from the heat emitters circuit, so that they are independent one from the other, by
means of a plate heat exchanger or similar, according to the hydraulic diagrams included in this manual (see the
corresponding paragraph).
ADISA HEATING by HITECSA (HIPLUS)
disposes of professional staff that, after a visit of the installation, can advise
you according to each case.
Summary of Contents for ADISA ADI CD 105
Page 1: ...TECHNICAL MANUAL OF INSTALLATION USE AND MAINTENANCE 4 2020 uk ADI CD CONDENSING BOILER...
Page 7: ...ADI CD Boiler Technical Manual 7 Models ADI CD 200 and higher...
Page 31: ...ADI CD Boiler Technical Manual 31 12 1 Electric drawing ADI CD 70 750...
Page 32: ...ADI CD Boiler Technical Manual 32 12 2 Electric drawing ADI CD 850 950...
Page 69: ...www adisaheating com ADISA HEATING HIPLUS AIRE ACONDICIONADO S L...