ADI CD Boiler – Technical Manual
55
18. THE BOILER START-UP
18.1 Before the start-up
The first start-up is a very important operation on which the future effectiveness and reliability of the equipment
can depend. For this reason, it must be carried out by our own Official Technical Assistance Service.
Before the start-up, it is important to check that:
-
The installation is in accordance with this manual’s instructions and with the local regulations.
-
The installation is full of water and vented of air.
-
The static water pressure of the installation (when cold) is between 1 bar minimum and 4 bar maximum.
-
The water circulation pumps operate in the correct direction.
-
The water cut-off valves are open.
-
The gas type and pressure correspond to the ones indicated for that boiler (see the boiler identification
plate).
-
The gas valves are open, the air of the gas installation vented and there are no gas leaks.
-
The electric connections are correct (220/230 V, 50 Hz, single phase, ground) so that the boiler is
electrically supplied.
-
The controls are set so as to require heat from the system.
Instruments required for the start-up:
-
A manometer to check the combustion chamber pressure drop, the gas injectors pressure and the inlet gas
pressure. We recommend using two digital manometers (or U-shaped manometers with water columns).
-
A flue electronic analyser to measure CO,
CO
2
, O
2
and the flues temperature.
-
Ammeter/electrical tester.
-
Ionization electrode, ignition electrode, fuses, screws, nuts.
18.2 Gas pressure switch
Model
Gas Pressure Switch
Adjustment
(mbar)
Type
Image
OFF
ON
105
10
Blind cover,
open the cover
to adjust
10
+/- 1
12,5
+/- 1
130 -
200
15
Transparent
cover, fixed to
the side of the
gas shut-off
valve
15
+/- 1
17,5
+/- 1
Resto
gama
15
Transparent
cover, connected
to a pipe to
facilitate access
15
+/- 1
17,5
+/- 1
Summary of Contents for ADISA ADI CD 105
Page 1: ...TECHNICAL MANUAL OF INSTALLATION USE AND MAINTENANCE 4 2020 uk ADI CD CONDENSING BOILER...
Page 7: ...ADI CD Boiler Technical Manual 7 Models ADI CD 200 and higher...
Page 31: ...ADI CD Boiler Technical Manual 31 12 1 Electric drawing ADI CD 70 750...
Page 32: ...ADI CD Boiler Technical Manual 32 12 2 Electric drawing ADI CD 850 950...
Page 69: ...www adisaheating com ADISA HEATING HIPLUS AIRE ACONDICIONADO S L...