3-20
(8) Turn the power on.
(9) Before software options are added and the EZJ99 board is attached to the IJP, set the
software option.
*) This procedure is not necessary when the software options have been installed and
only the EZJ99 is replaced. Jump to (10) in this case.
(10) Execute the system reset.
(11) Return the backed up data to IJP.
(12) Turn the power off. Connect wires from external devises to the TB1 depending on
software options.
Attach the included ferrite core to the cables as below.
-
Applied wire size:
AWG26 – 14 (0.4 mm –1.6 mm)
-
Peeling length of cables: 9 mm
Connection cable
Ferrite core
TB1
EZJ99circuit
board
As for the copy data
function, see “2.9
Backup”.
As for the System
reset, see “2.8 System
reset”.
As for the software
option setup, see “2.14
Software option setup”.
Summary of Contents for PXR
Page 1: ...Service Manual HITACHI Printer Model PXR Revision December 2008 Version C ...
Page 80: ...3 17 3 17 Circuit diagram of EZJ95 ...
Page 215: ...8 2 8 1 2 Circulation system diagram PXR P ...
Page 216: ...8 2 Air system diagram PXR P 8 3 ...
Page 217: ...8 4 8 3 Electrical Connection Diagram 8 3 1 Electrical Connection Diagram PXR D ...
Page 218: ...8 5 8 3 2 Electrical Connection Diagram PXR H ...
Page 219: ...8 3 3 Electrical connection diagram PXR P 8 6 ...