54
P5416904
(1) Schedule Table
Object
Display [All] and select the [Block] and the
[Group] that are set.
Cell
The vertical axis is the day of the week and specific day for every season and
the horizontal axis is the number of the operation pattern (16 patterns per day).
Enter the operation pattern in the cell and set the schedule.
Setting method
Select from [Overwrite only where changed] [Overwrite All] the method when the content set has been reflected from the upper
lever to the lower level.
Simple Setting
Set the Schedule by
following the easy
procedure.
Day
Enter/ Modify the
Operation pattern in
the cell from this item
and set the Schedule.
Pattern name
Set the Operation
pattern. The Operation
pattern can be set to 16.
Copy
Copy the Schedule of the cell.
Paste
Paste in the cell the
Schedule copied.
Delete
Delete the Schedule
of the cell.
Spec. day setting
Set the period of Specific day. The Specific Day can be set to 5 patterns every season.
Summer/Winter setting
Set the period of Summer season/
Winter season.
Change
Modify the Schedule of
the cell.
Done
Save the modified
setting.
NOTICE:
Copying and pasting is a method for duplicating the attributes of one to another cell thereby reducing the
programming burden for the user.
The enable/disable function of [Capacity] and [Lower noise] with the setting range may differ depending on
the corresponding Outdoor unit.
Concerning the corresponding Outdoor unit, please contact your contractor or distributor.
● When performing the Outdoor unit capacity control and the Lower Noise, set at least one Central
Controller.
● Depending on the External Input, when performing Capacity Control or Lower Noise, the External Input
in process will disable the Capacity Control or Lower Noise depending on the schedule.
Spec. day details
Verify the specific day currently set.