44
P5416904
1. Click on [Check connection] and start the connection verification of the AC.
When there is no connection information, the Check connection is executed automatically. In case there
is a Check connection executed once with information for the AC, do not perform the Check connection
until the button can be selected. The procedures for the Check connection are indicated below:
Click on [Check connection].
Cancel the Check connection.
Cancel the Check connection.
Use the registered data and
execute the Check connection.
Cancel the Check connection.
Cancel the registered data and
execute the Check connection.
2. Click on [Cancel] to interrupt the Check connection
3. After the Check connection is completed, the Outdoor unit, Thermal Storage unit and the Indoor unit will
be indicated by a [○].
4. The process status of the Check connection is indicated by the progress bar.